تحدث عمليات تبديل النقل الثابت بناءً على عملية البدء والنقل. The initiation process is the process of determining that a transfer needs to take place. The event may include loss of mains power or inconsistent mains voltage. Transfer is the process of transferring load from a second or backup power source and vice versa.
How to use sts transfer switch
Automatic: In automatic mode, the transfer switch controller manages the entire process, and when the controller detects the loss of mains power, start-up begins. The controller monitors the supply voltage and sends a run command to the generator when the voltage falls below a preset limit for a specified time. The controller also monitors the secondary supply voltage and frequency, and when these values ​​are within acceptable ranges, the switch transfers the load from the primary supply to the secondary supply.

The switch can automatically transfer the load back to the mains when the mains is re-established within a specified time to ensure stability. As defined by the NEC, most critical and life safety loads need to operate automatically.

Non-automatic: In the non-automatic mode, the transfer switch is manually activated by the operator, and then the internal device within the switchgear operates the transfer switch by electric operation. The operator has the ability to decide when to initiate load transfer, but the actual transfer operation is electric.
More content: BWITT Power takes you to understand the single-phase static bypass transfer switch

Manual: In manual mode, the whole process is done manually by the operator. Typically there is no controller, voltage sensing device or electrical mechanism to operate the load transfer. Manual switches are the most basic type of transfer switch and are common in non-critical facilities or applications.

The above is how the "التبديل ثابت" sts transfer switch is used, based on the relevant content of the startup and transfer process. Thank you for reading, you can pay attention to BWITT enterprises

اترك رد

لن يتم نشر عنوان بريدك الإلكتروني. تم وضع علامة على الحقول المطلوبة *

العاكس المتوازي - 18
بالفعل 1902 رسائل

  • العاكس المتوازي - 18 10:12 أكون, اليوم
    Pure Sine Inverter 48 فولت تيار مستمر إلى تيار متردد 120 فولت تيار متردد أحادي الطور عاكس طاقة, Pure Sine Inverter 48 فولت تيار مستمر إلى تيار متردد 120 فولت تيار متردد أحادي الطور عاكس طاقة